FAA REGISTRY
N-Number Inquiry Results
Serial Number | 172S10770 | Status | Valid |
Manufacturer Name | CESSNA | Certificate Issue Date | 04/21/2025 |
Model | 172S | Expiration Date | 04/30/2032 |
Type Aircraft | Fixed Wing Single-Engine | Type Engine | Reciprocating |
Pending Number Change | None | Dealer | No |
Date Change Authorized | None | Mode S Code (base 8 / Oct) | 51566276 |
MFR Year | None | Mode S Code (Base 16 / Hex) | A6ECBE |
Type Registration | LLC | Fractional Owner | NO |
Name | DORNOCH SERVICES LLC | ||
Street | 8 THE GRN STE 18020 | ||
City | DOVER | State | DELAWARE |
County | KENT | Zip Code | 19901-3618 |
Country | UNITED STATES |
Type Certificate Data Sheet | None | Type Certificate Holder | None |
Engine Manufacturer | Unknown | Classification | Unknown |
Engine Model | Unknown | Category | None |
A/W Date | None | Exception Code | No |
The information contained in this record should be the most current Airworthiness information available in the historical aircraft record. However, this data alone does not provide the basis
for a determination regarding the airworthiness of an aircraft or the current aircraft configuration. For specific information, you may request a copy of the aircraft record at https://aircraft.faa.gov/e.gov/ND/ |
None |
Certificate Number | T255025 | Issue Date | 04/21/2025 | Expiration Date | 05/21/2025 |
Mod Code | 28 | Mod Date | 20080725 |
THIS AIRCRAFT HAS BEEN EQUIPPED WITH A TEMPORARY FERRY FUEL SYSTEM, CONSISTING OF ONE 124 GALLON TANK INSTALLED IAW EA-FSDO-65 ACCEPTED DATA AND TELFORD AVIATION SERVICES INC. REPORT TAS-CE-172S. SEE ATTACHED WEIGHT/BALANCE DATA. THIS TEMPORARY WEIGHT/BALANCE DATA WILLREMAIN IN EFFECT FOR THE DURATION OF THE SPECIAL FLIGHT PERMIT (FAA FORM 8130-7) AND/OR THE TEMPORARY FUEL SYSTEM IS REMOVED. TCDS 3A12 NOTE 3 APPROVES THE 130% TAKE OFF WEIGHT. REQUIREMENT FOR ADDITIONAL OIL HAS BEEN ESTABLISHED IN ACCORDANCE WITH AC23.1011-1. REMOVAL INSTRUCTIONS ARE INCLUDED ALONG WITH FERRY FUEL SYSTEM MANAGEMENT INSTRUCTIONS. NOTE: THIS IS A TEMPORARY INSTALLATION. UPON ARRIVAL AT DESTINATION; THE TEMPORARY FERRY FUEL SYSTEM MUST BE REMOVED; THE AIRCRAFT INSPECTED FOR DAMAGE AND PROPER OPERATIONS; AND THE COMPASS CHECKED FOR ACCURACY BEFORE RETURNING THIS AIRCRAFT TO SERVICE. THE CURRENT WEIGHT AND BALANCE DATA IN THE FAA APPROVED AIRPLANE FLIGHT MANUAL OR PILOTS OPERATING HANDBOOK WILL AGAIN APPLY. |
None |